Project

S3 is a 9storey building for office use, with restaurant and flexible retail, business, non-residential institutions and assembly and leisure at ground floor level.

Building specifications

  • Unitised curtain wall system with glazed infills, scalloped profiled terracotta on serrated shaped spandrels, projecting vertical aluminium fins, sills and horizontal copping.
  • Double-glazed proprietary capped aluminium ‘stick’ curtain wall system. Horizontal and vertical insulated pressed aluminium infill panels.
  • Proprietary horizontal extruded louvres system. Side hung doors.
  • Prefabricated unitised window panels to stair and lift core – Prefabricated unitised panels forming punched windows to stair core.
  • Double glazed capped-fixed aluminium stick curtain system
  • Terracotta rainscreen cladding
10.100 sqm

worked area

2023

finished date

42 wks

execution time

Image Gallery